805 Oil Well, Bustuchin – Romania

Within this project, OFS provided for OMV PETROM the design and execution of casing restoration and safety works for an oil well, consisting of a circular shaft from tangent piles F800mm, excavation to a depth of 27.5 m with ATEX equipment, cutting of oil well casing with diamond wire and vacuum brazed disc, as well as earthfilling and land restoration works.